Increasing Intensity Of Cold, Plain Areas Covered By Heavy Fog, Motorways Closed

 Canada Global(Web News)The severity of the cold in the country has not reduced, the plains are still covered in heavy fog, the motorways have been closed from different places due to low visibility.

The spokesperson of the Meteorological Department has said that during the last 24 hours, the weather has been very cold, dry and foggy in most parts of Punjab, Lahore has recorded a minimum temperature of 6 degrees and a maximum of 14 degrees Celsius. .
During the next 24 hours, heavy fog will prevail in the plains of the country including Lahore, Sialkot, Gujranwala, Narang Mandi, Narowal, Sargodha, Badumli, Okara, Faisalabad, Toba Tek Singh.

On the other hand, the spokesman of the Motorway Police said that with the cold weather, the period of fog on national highways increased, due to heavy fog, Motorway M4 from Shorkot to Pindi Bhatian and Motorway M5 from Sher Shah to Ouch Sharif were closed for traffic. was given.
He said that the motorways are closed for the safety of people and to ensure safe travel, citizens should prefer to travel during the best hours of the day, the best time to travel is from 10 am to 6 pm during the foggy season. There are times. .

Back to top button